section 8 housing

Valley Terrace

Location:
982 Toomes Ave, Corning, CA 96021
48 Total Units

Work scope:

  • Remove and replace all windows
  • Supply and install fiber cement siding and trim for all buildings but only 3 sides
  • Back walls of all units to replace rotten t1-11 with new t1-11 siding
  • Paint all buildings
  • Demo and finish (6 or 8 units cant remember) inside and make all electrical, plumbing, showers, hallways, bedroom doors, cabinets ADA compliant. Complete interior finish.

Project Type:

Commercial

Products Used:

Fiber Cement Siding

Valley Terrace Apartments Exterior & Interior Renovation in Corning, CA

The Valley Terrace Apartments renovation at 982 Toomes Avenue in Corning, California, represents a comprehensive transformation of a 48-unit residential community through coordinated exterior and interior improvements. This project required a balance of durability, code compliance, and visual consistency across multiple buildings, all while maintaining livable conditions and long-term performance standards appropriate for a Northern California climate.

Located in Corning, a city known for hot summers, seasonal rainfall, and agricultural surroundings, the property demanded exterior materials and construction methods capable of standing up to environmental exposure while minimizing future maintenance. The scope of work extended beyond exterior upgrades alone, incorporating significant interior renovations to improve accessibility and overall functionality for residents.

This project reflects a practical, detail-driven approach to commercial renovation, where performance, compliance, and cohesive design were prioritized across every phase of the work.

Project Overview

Project Name: Valley Terrace Apartments
Location: Corning, CA
Project Type: Commercial
Total Units: 48
Products Used: Fiber Cement Siding

Scope of Work:

  • Removal and replacement of all existing windows
  • Supply and installation of fiber cement siding and trim on three sides of all buildings
  • Replacement of deteriorated T1-11 siding on rear elevations
  • Full exterior painting across all structures
  • Interior demolition and rebuild for ADA-compliant units
  • Electrical, plumbing, showers, doors, cabinets, and hallway modifications to meet accessibility requirements

This was a multi-phase project involving both exterior envelope upgrades and interior renovations, requiring careful coordination between trades and a clear understanding of commercial building standards.

 

Understanding the Property and Renovation Needs

Valley Terrace Apartments consists of multiple two-story residential buildings arranged across a shared site, with consistent architectural forms repeated throughout the property. While this uniformity offers visual continuity, it also requires precision during renovation to ensure every structure receives the same level of care and finish quality.

Prior to renovation, portions of the exterior siding showed signs of age-related deterioration, particularly along rear elevations where moisture exposure had affected the original T1-11 panels. Window systems also required full replacement to improve energy performance and update the exterior appearance. Internally, select units required reconfiguration to meet ADA accessibility standards, adding an additional layer of complexity to the project.

The goal was not only to improve the appearance of the property, but to strengthen its structural durability, extend its service life, and create safer, more functional living spaces for residents.

 

Exterior Siding Strategy and Material Selection

Fiber cement siding was selected as the primary exterior cladding material due to its proven performance in Northern California conditions. The material provides strong resistance to moisture, rot, and temperature fluctuation, making it well-suited for a multi-unit residential setting where long-term reliability is critical.

On this project, fiber cement siding and trim were installed on three sides of each building. Rear elevations, where existing siding had deteriorated, required removal and replacement with new T1-11 panels to restore structural integrity before finishing. This approach allowed for targeted replacement where necessary while maintaining consistency across the overall exterior design.

The combination of fiber cement siding and properly detailed trim created clean horizontal lines and uniform transitions across all buildings, reinforcing a cohesive visual identity throughout the property.

 

Window Replacement Across All Units

All existing windows throughout the Valley Terrace Apartments were removed and replaced as part of the renovation. Window replacement played a key role in improving both the exterior appearance and functional performance of the buildings.

New windows were installed with careful attention to flashing, sealing, and integration with the siding system. Proper window installation is critical in preventing moisture intrusion, especially in multi-story structures where water management must be consistent across multiple elevations.

The updated windows also contribute to improved interior comfort, better natural light distribution, and a refreshed exterior appearance that aligns with the new siding and paint scheme.

 

Exterior Painting and Visual Cohesion

Once siding installation and repairs were complete, all buildings received a full exterior paint application. The color palette was selected to enhance the architectural form of the structures while maintaining a neutral, welcoming appearance appropriate for a residential community.

Painting served both aesthetic and protective purposes, sealing exterior surfaces and reinforcing the durability of the siding system. Consistent application across all buildings ensured the property reads as a unified whole rather than a collection of individual structures.

Trim elements were finished cleanly to frame windows, corners, and rooflines, adding definition without overpowering the overall design.

 

Interior Renovations and ADA Compliance

In addition to exterior improvements, select units underwent full interior demolition and reconstruction to meet ADA accessibility requirements. These upgrades required coordination across multiple trades, including electrical, plumbing, and finish carpentry.

Interior work included modifications to:

  • Electrical systems
  • Plumbing layouts
  • Showers and bathrooms
  • Hallways and door clearances
  • Bedroom doors and cabinetry

ADA-compliant units were rebuilt to ensure safe, accessible living spaces while maintaining consistency with the overall interior design of the community. These upgrades improve long-term usability and ensure the property meets current accessibility standards.

 

Coordination and Phased Execution

Renovating an occupied, multi-building residential property requires careful planning and execution. Work at Valley Terrace Apartments was phased to minimize disruption while maintaining progress across exterior and interior scopes simultaneously.

Exterior crews focused on siding, window replacement, and painting in a methodical sequence, while interior teams addressed ADA units in designated phases. This approach allowed the project to move forward efficiently without compromising quality or safety.

Clear communication between teams ensured transitions between trades remained smooth, and that completed work met both performance and inspection requirements.

 

Addressing Rear Elevations and Structural Repairs

Rear building elevations required special attention due to the condition of existing T1-11 siding. In these areas, deteriorated panels were removed and replaced to restore the integrity of the exterior walls.

This work was essential in preventing future moisture-related issues and ensuring the new exterior finishes had a stable substrate. By addressing underlying issues rather than simply covering them, the renovation strengthened the long-term performance of the buildings.

Once repairs were completed, rear elevations were finished to match the rest of the property, maintaining visual consistency across all sides of each structure.

 

Long-Term Performance Considerations

Every material and installation method used on this project was selected with longevity in mind. Fiber cement siding offers strong resistance to common issues such as swelling, warping, and pest damage, making it a practical choice for a property of this size.

Window replacements improve thermal performance and reduce air infiltration, while fresh exterior paint protects surfaces from UV exposure and moisture. Interior ADA upgrades ensure long-term compliance and adaptability as resident needs evolve.

Together, these improvements reduce maintenance demands and support the property’s continued use as a residential community.

 

Visual Impact Across the Property

The completed renovation delivers a refreshed, cohesive appearance across all 48 units. Clean siding lines, consistent trim detailing, and updated windows give the property a renewed presence while respecting its original architectural form.

From street-facing elevations to interior courtyards and rear walkways, the buildings now present a unified, well-maintained appearance. This consistency reinforces the sense of community and improves the overall experience for residents and visitors alike.

 

The Final Result

The Valley Terrace Apartments renovation in Corning, CA, reflects a comprehensive approach to commercial residential remodeling. By addressing exterior durability, interior accessibility, and visual consistency simultaneously, the project delivers meaningful improvements across every aspect of the property.

This renovation enhances curb appeal, strengthens building performance, and supports long-term occupancy through thoughtful material selection and careful execution. The completed work provides a durable, functional foundation that will serve residents and property managers for years to come.

 

Project Summary

This commercial renovation project demonstrates the value of coordinated exterior and interior upgrades when working with multi-unit residential properties. Through targeted siding replacement, full window upgrades, comprehensive painting, and ADA-compliant interior renovations, Valley Terrace Apartments now benefits from improved performance, accessibility, and visual cohesion.

The finished property stands as a practical example of how well-planned renovations can extend the life of existing buildings while meeting modern standards for durability and accessibility.

 

Planning for Occupied Properties and Resident Coordination

One important aspect of a project like Valley Terrace Apartments is managing work on an actively occupied property. Exterior renovations and interior upgrades often take place while residents continue living on-site, which requires thoughtful planning and clear sequencing. For this project, work zones were carefully organized so crews could move efficiently between buildings without disrupting daily routines more than necessary.

Exterior work was scheduled to maintain safe access to walkways, parking areas, and entrances, while interior renovations were isolated to designated units undergoing ADA upgrades. This approach helped limit noise, dust, and temporary access restrictions to specific areas rather than impacting the entire community at once.

For property owners and managers, this type of coordination is critical. A well-planned renovation minimizes tenant inconvenience, reduces safety risks, and keeps projects moving forward without unnecessary delays. When exterior and interior work is handled with structure and communication, large-scale renovations can be completed smoothly while preserving livability throughout the process.

section 8 housing

Valley Terrace

Visit Heritage Exteriors Sliding & Windows Today